Thank you! However, I still do not understand the dismissed action. How does the manager refuse change? From what I can see, there is only one option “release” and “Cancel Release”. The “Unshare” option cannot be used if the delivery plan is blocked (message: “Release has not yet taken place”), so it seems that you need to “unblock” and then “cancel” before saving and finishing? Does this change the agreement and trigger the refusal confirmation sent to the initiator? When I tried, it didn`t work, so I guess I missed something? An order request of the RV framework contract type can be placed manually by a customer with salary positions (position type – Subcontracting). The order requirement can be converted into a delivery plan. The delivery plan is subject to approval on the basis of predefined parameters before generating delivery plan or classification positions (manually or by order) and communicating to the subcontractor. Delivery is set up, the goods are commissioned and shipped to the subcontractor. With the delivery of the finished material, the receipt of the goods is established. The billing process is then triggered. 4.List of sources established for components with delivery plan and use of provisions 2 (residue data set). To overcome these problems, delivery plans are used to replace the often needed standard component orders. I have a problem with the delivery plan (LPA type).

I have established a delivery plan and am maintaining the schedule by running the MRP. The schedule could be maintained and I can run the version (generate SA versions for FRC and JIT). The release was documented directly there (I can see it if I view the delivery plan for SA) and I can also print it. The problem is that the status of the documentation of its version is still yellow (even if there are already message editions). As a result, the output number of this SA is still blocked in point 1, although changes in the content of the expression have already taken effect (the transmission of the dividing line has been modified because the RM has consumed the SA or has effects on the current layout). 1.Delivery plans established with a validity period of 6 months with maximum possible quantity for all suppliers. (ME31L) Has anyone implemented this type of scenario for the delivery plan? The delivery plan is a long-term sales contract with the supplier, in which a supplier is required to supply material on pre-established terms.. . .

.